Home   |   Train Rides   |   Location   |   Facilities   |   History   |   Our Mission   |   Membership   |   Contact Us


 Hot News

 Member News

 Charters

 School Programs

 Make a Donation

 Equipment

 Other Area
 Attractions


 More Information



2002 TEA-21 Grant

The trackwork from Greenbrier down and into Rion has been completed. The new rail and ties have been installed in the Greenbrier Cut. The completion of this section will allow passenger trains to operate into the Rion Quarry area for the first time providing a 10 mile round trip.

This view is looking east towards Greenbrier at the Rion Road crossing. Rion road crossing looking east  

Compare these recent pictures to the ones below from last August. What a difference!!

This is part of the Greenbrier Cut looking east from the Kelly Miller Road highway bridge after installation of the new track. Cut after work looking east from highway bridge  
This is part of the Greenbrier Cut looking west from the Kelly Miller Road highway bridge after installation of the new track. Cut after work looking west from highway bridge  

Photos from Last August 2003

This is part of the Greenbrier Cut looking west from under the Kelly Miller Road highway bridge prior to the work starting. Cut before work looking west from highway bridge  
This photo shows the same area as above looking west after the dirt work was done. Cut before work looking west from highway bridge  

For more information, please call 803-635-4242 (9-5 Weekdays) or call 803-635-9893 (Recorded message).

Business Address:
The South Carolina Railroad Museum, Inc., 110 Industrial Park Road, Winnsboro, SC 29180

Mailing Address:
The South Carolina Railroad Museum, Inc., P.O. Box 7246, Columbia, SC 29202-7246

Please read our Disclaimer.

©2008 The South Carolina Railroad Museum, Inc. All rights reserved.